Bathroom renovation

What we did

PCR Constructions worked closely with the client to renovate their existing bathroom into a modern new space with a more efficient layout creating more space. This transformation took 4 weeks from start to finish and included:

  • Demolition of the existing bathroom
  • Removal of a semi ensuite door access and the brick up of the opening to bedroom 2
  • Installation of a new brick nib wall for shower products
  • New plumbing for wall hung vanity allowing for a new second sink
  • New plumbing layout for updated fixtures and fittings
  • Electrical work allowing for power inside the vanity and shaver cabinet
  • 1500mm double sink wall hung vanity with 20mm stone bench top
  • Waterproofing as per Australian standards
  • Installation of 300 x 300 floor tiles and 300 x 600 walls tiles
  • Tile inserts for that great finish on the floor
  • Chrome semi frameless shower screen
  • Installation of HPM 2in1 heater exhaust fan with new Clipsal iconic switches
  • 1500mm triple mirror shaver cabinet
  • 2 robe hooks for bath towels