Bathroom renovation
What we did
PCR Constructions worked closely with the client to renovate their existing bathroom into a modern new space with a more efficient layout creating more space. This transformation took 4 weeks from start to finish and included:
- Demolition of the existing bathroom
- Removal of a semi ensuite door access and the brick up of the opening to bedroom 2
- Installation of a new brick nib wall for shower products
- New plumbing for wall hung vanity allowing for a new second sink
- New plumbing layout for updated fixtures and fittings
- Electrical work allowing for power inside the vanity and shaver cabinet
- 1500mm double sink wall hung vanity with 20mm stone bench top
- Waterproofing as per Australian standards
- Installation of 300 x 300 floor tiles and 300 x 600 walls tiles
- Tile inserts for that great finish on the floor
- Chrome semi frameless shower screen
- Installation of HPM 2in1 heater exhaust fan with new Clipsal iconic switches
- 1500mm triple mirror shaver cabinet
- 2 robe hooks for bath towels